EGC Energy provides cost-efficient reliable electricity; anywhere in the world with its rental fleet consists of mobile FT8® Mobilepac® rental gas turbine package. EGC Energy offers movable turnkey temporary power systems solutions anywhere in the world in a wide range of applications such as disaster relief, supplemental capacity, seasonal peak shaving, backup for scheduled or unscheduled outages, dedicated industrial power.

FT8® Mobilepac® gas turbine package is developed and manufactured by PW Power Systems (PWPS - formerly Pratt & Whitney ®) which is a subsidiary of Mitsubishi Heavy Industries, Ltd. (MHI). MHI is a diversified Fortune “Global 150” company with more than $30 billion in annual revenues and 40,000 employees worldwide. In this sense, FT8® Mobilepac® gas turbine package is a product of 30 years of technology.

With a power well enough for a small town, these 25 MW of mobile gas turbine package is designed to provide fast and reliable energy where there is an energy shortage especially in the case of disaster and emergency such as earthquakes, floods, landslides etc. Highway compatible of mobile units offers rapid deployment worldwide via road, sea freight or airfreight. Environmentally compatible gas turbine package can be driven to a site and begin generation emergency power in less than one day. With a remote operation, FT8® Mobilepac® Gas turbine package, committed to provide high quality, reliable, fast solutions for the emergency power. The MOBILEPAC® gas turbine package has fuel flexibility advantage and also it requires the smallest footprint in the industry, utilizing as little as 25-foot by 60-foot space. This allows the MOBILEPAC to be installed in almost any location. Very little advance site preparation is required for the sighting, and no foundation or concrete pad is necessary for installation of the unit. The highway compatible unit is transportable by land, sea or air to anywhere in the world, allowing worldwide delivery of the MOBILEPAC® gas turbine package within 24 hours. Mobile turbines also produce significantly less emissions making them environmentally sensitive products.

The MOBILEPAC® gas turbine package has fuel flexibility advantage and also it requires the smallest footprint in the industry, utilizing as little as 25-foot by 60-foot space. This allows the MOBILEPAC to be installed in almost any location. Very little advance site preparation is required for the sighting, and no foundation or concrete pad is necessary for installation of the unit. The highway compatible unit is transportable by land, sea or air to anywhere in the world, allowing worldwide delivery of the MOBILEPAC® gas turbine package within 24 hours. Mobile turbines also produce significantly less emissions making them environmentally sensitive products. With a remote operation opportunity, The MOBILEPAC® gas turbine package design includes two trailers which are ready for immediate deployment. The first contains the gas turbine, electric generator, exhaust collector, diffuser and engine lube oil system. The second trailer carries the 15 kV switchgear, control system, operation panel, protective relays, batteries and charger, motor control center and the hydraulic start package. A pre-commissioned MOBILEPAC® gas turbine package can be driven to a site and begin generating power in less than one day.

Benefits

 

> Fast emergency power generation
> Full installation, turnkey approach
> 25 MW output continuous (well enough for a small town)
> Ready for emergency power within one day (site ready)
> Environmentally compatible
> 2x Trailer System, requiring small footprint with the dimensions (space-conscious design)
> Highway compatible
> Deployment worldwide – land, sea or air (within 24 hours)
> Fuel flexibility (Dual fuel/ liquid of gas)
> Frequency flexibility (Dual frequency/ 50 or 60 Hertz)
> Optional black start capability
> Three-point support and structural rigidity to maintain generator alignment
> Remote operation and monitoring
> Full operations & maintenance

 

Product Facts
 
Output (kW)
2500
Base engine
FT8®
Number of Trailers
2
Installation
8 hours (site ready and previously commissioned)
Noise
95 dba at 1 meter
NOx / CO
50 mg / 100 m3
Grid
50 or 60 Hertz
Fuel
Liquid or Gas
Please contact us today to request for detailed product specifications, we would be pleased to serve you.